From first site visit to long-term maintenance.
A tensile structure is engineered, not assembled from parts. These are the six stages every project goes through, and what happens at each one.
-
01
Consultation & site survey
We visit the site, take measurements, and establish what the structure has to do — spans, clearances, drainage, and how the space is used.
-
02
Design & form finding
The membrane geometry is form-found so that tension is distributed evenly across the surface. You see the structure in 3D before anything is cut.
-
03
Engineering
Structural analysis against wind and service loads, with steelwork, cables, connections and foundations detailed to suit the site.
-
04
Fabrication
Patterns are cut and welded in our production unit, with the steel fabricated and finished in parallel.
-
05
Installation
Erection and tensioning on site by our own installation crews, with the membrane brought to its designed tension.
-
06
Maintenance
Inspection, re-tensioning and re-skinning as the structure ages, carried out by our engineers.
Three things get a quote moving.
The area to be covered
Approximate length and width, or a site plan if you have one. Even a rough sketch with dimensions is enough to start.
What it has to do
Parking, a walkway, an entrance, a pool, an auditorium — and whether it needs to be permanent, demountable or retractable.
A photograph of the site
More useful than any description. It tells us about access, existing structures, levels and what the structure has to sit against.